Production suspended at Galoc field

PALAWAN, PHILIPPINES: The Galoc Production Company (GPC) is suspending production at the Galoc field due to category 1 Typhoon Emong (Chan Hom) passing 300 nautical miles (1,666.8 km) to the north of the field.

Production is being suspended while preliminary preparations are being made to disconnect the FPSO [floating production, storage and offloading vessel] if necessary.On May 5, the fifth offtake from the FPSO was completed with a total of over 336,000 barrels. The next offload is scheduled for the end of May or early June. The Galoc Field is in SC14-C in 290 meters (951 ft) of water offshore Palawan in the Republic of the Philippines. Galoc field has two subsea production wells tied back to an FPSO via a seabed pipeline and mid-water riser system.

Read More

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: